Drafted from receiving; sending Monday.
Marmi Apuani · SCL-2026-0005
New- New
- Sent to Supplier
- Under Review
- Accepted
- Settled
Lines Claimed
The three receiving variances that are the supplier's to answer, valued at the PO price per sqft on the listed area, in the supplier's currency. Raised against BILL-2026-0104, which was paid in full against documents before the container landed.
| Slab | Material | Size | Area | Reason | Decision | Outcome | Claimed |
|---|---|---|---|---|---|---|---|
| SA-0617B-1213 · L1 | Statuario · 2cm Polished1st Choice · ORD-2026-0034 | 300×160 cm | 51.7 sqft | Broken on ArrivalThrough-crack across the lower third, found on unbundling · A-frame intact | WaitingNot sent yet | —Not settled | €2,171.40$2,388.54 · €42.00/sqft |
| CV-0906B-1214 · L2 | Calacatta Viola · 2cm Polished1st Choice · held for Meridian | 320×162 cm | 55.8 sqft | Wrong MaterialCalacatta Vagli: grey ground, no violet veining · quarantine bay Q-1 | WaitingNot sent yet | —Not settled | €2,678.40$2,946.24 · €48.00/sqft |
| CR-08Crate · L3 | Carrara Honed 12″×24″Crate of 80 boxes · Standard | Crate120×100×90 cm | 640 sqft | Short-ShippedListed on the packing list, not in the container · seal intact | WaitingNot sent yet | —Not settled | €2,176.00$2,393.60 · €3.40/sqft |
Not claimed from the same container: CV-0905 measured 326×166 cm, 58.2 sqft (+2.4) against its listed 320×162 cm; it was billed on the listed area, so the difference is in our favour and noted on the receipt. CV-0907 is pending inspection on A-frame AF-3; if it fails, add it here as a fourth line.
Evidence
Pulled from the receipt, not asked for again: the 6 variance photos J. Pérez took at Miami Yard on Fri Oct 2 and Sat Oct 3, each filed under its slab. Every file goes to the supplier with the claim.
Thread with Marmi Apuani
One thread for the claim. Marmi Apuani is not on Vava, so the claim goes by email with its PDF and photos, and every reply comes back here. An internal note is never sent.
Who Gets It
- To
- Giulia Bertolucci · export sales
- Cc
- Paolo Lenzi · logistics, who sent the loading photos
- By
- Email with the claim PDF · replies by email land on this thread
- Reply By
- Fri Oct 16 · 14 days from receipt
- Reminders
- Every 3 days once sent, while unanswered
- Past the Date
- Reply Overdue on the claim, and an alert to E. Costa · never closed on its own
Settlement
How the claim is to be paid back, asked for in the claim and confirmed when Marmi Apuani answers. The next container from the same quarry is the usual place. Nothing is chosen until you choose.
A credit lands only on the PO you pick. A partial answer is possible: the lines the supplier accepts settle this way, the rest stay open. Open PO-2026-0230
Stock Effect
What happens to each slab when the claim settles. Slabs rarely go back across the ocean; a broken one is written off, kept as a remnant or regraded.
Credit Note
The supplier's credit note, recorded against the claim lines it covers. It cannot exceed BILL-2026-0104 (€81,775.40), and its number is checked against every Marmi Apuani credit note and bill.
No credit note yet. When Marmi Apuani sends one, record it here against the lines it credits.
Effect on Client Orders
What receiving already did for the clients these slabs were sold or held for. The claim changes none of it.
Claim Letter
The formal claim a quarry still expects: the slab list with sizes and area, the photos, and the credit asked. Built from the Supplier Claim v1 template.
Supplier Claim v1
PDF · slab list, photos, credit asked · 3 lines · €7,025.80
Goes to Supplier with the claim
Timeline
Every step on the claim, newest first. Nothing here is edited or removed.
- Sat Oct 3Internal note: "Drafted from receiving; sending Monday." · E. Costa
- Sat Oct 3Claim drafted · 3 lines valued at the PO price, €7,025.80 · window to Fri Oct 16 · E. Costa
- Sat Oct 3BILL-2026-0104 matched slab by slab: Exception, €7,025.80 carried to this claim · three-way match on receipt
- Sat Oct 3Raised from receiving: SA-0617 broken, CV-0906 wrong material, CR-08 short · 6 photos attached · J. Pérez's variances on ARR-0223-1
- Sat Oct 3SA-0621 substituted for SA-0617 on ORD-2026-0034 box 1 · E. Costa notified
- Sat Oct 3Meridian Design Studio's hold set to move from CV-0906 to CV-0907 once it passes · S. Ramirez notified
- Fri Oct 2Receiving started at Miami Yard · J. Pérez
- Fri Oct 2 · 11:40ARR-0223-1 delivered to Miami Yard · the supplier's 14-day claim window opens · Everglades Drayage