81slabs · 7 A-frames
4,386.6sqft
26,675 / 26,700 kg99.9%weight · payload 40 ft HC
35.4 / 58 m³61%volume
Weightcloses first
Oct 14in 11 daysETA San Juan · first ETA Oct 12

Status

The container path this tenant configured · set per delivery, the order rolls up from it
  1. Draft
  2. Pending Approval
  3. Confirmed
  4. Allocated
  5. Loading
  6. Loaded
  7. On Water
  8. Arrived
  9. Documents Released
  10. Closed
Container 40 ft HC · FCL Ships from Miami Yard Sells from Miami Yard Next: Arrived on the carrier's arrival milestone, by itself Documents Released needs $286,742 received

Request pending · Marbles & Granite is not on Vava yet: status changes go to Rafael Ortiz by email and the client page; once the connection is accepted the same events land in their Purchase Orders and Arrivals without re-keying.

Tracking at Sea

Tracked by B/L MSCUPE2341118 · carrier MSC detected from the number · updates arrive on their own
Position: carrier report + AIS Chart © OpenStreetMap contributors Live chart needs internet · showing the last report Alerts: ETA moves over 1 day · stuck at a transshipment over 3 days · arriving within 3 days Alert settings
  1. Sep 16Gate-in Miami Yard · 14:20 · empty box, haulier · actual
  2. Sep 18Loaded on MSC Aurora Port Everglades · 15:20 · carrier · actual
  3. Sep 18Departed Port Everglades · 18:40 · AIS confirmed · actual
  4. Sep 24Transshipment Freeport · 21:05 · MSC · actual · same vessel, 2 days alongside
  5. Oct 3At sea, 24.1° N 72.9° W 06:40 · AIS · actual · 2 h ago
  6. Oct 14Arrival estimated San Juan · carrier ETA · first ETA Oct 12
  7. Oct 15Discharged estimated Puerto Nuevo terminal · from the carrier's schedule
  8. —Available · Gate-out · Empty returned after discharge · tracking stops itself at empty return

ETA Oct 14 · 2 days later than the first ETA · changed Sep 20 by the carrier's schedule update · the client was told the same day · requested sailing Sep 18 met · latest acceptable arrival: not set